The conceptualization of an 18 family community with close call to the heritage mark of trivandrum, The Kowdiar palace and the travancore royal family is seeing its completion. The location, looked upon as elite and that which edifies itself with close access to the Golf Links, The Tennis Club, Shopping points and other services and deliverables stays robust in the eyes of home owners.
Structured intellegently and backed by architectural incredulity, the community address its propinquity to hospitals, Educational institutions and other major Professional Workspaces. Arcon Premia is the threshold to the little corner of the world you can call home.
Project Completed |
Ceiling plastering | 99 % |
Electrical wall chasing and box fixing | 100 % |
Inside wall plastering | 100 % |
Internal plumbing work | 95 % |
Inside Water proofing work | 100 % |
External wall plastering | 100 % |
Internal painting work | 70 % |
Electrical wire pulling | 100 % |
Overhead Tank work | 100% |
HT Work | 83% |
External Painting | 60% |
Compound wall | 70% |
External putty | 90% |
Tile laying | 98% |
Fabrication work (staircase) | 100% |
Fabrication work (Grill) | 85% |
Aluminium Work | 78% |
Lift Work | 98% |
Switch Fixing | 40% |
Yard Work | 50% |
Ceiling plastering | 99 % |
Electrical wall chasing and box fixing | 100 % |
Inside wall plastering | 100 % |
Internal plumbing work | 80 % |
Inside Water proofing work | 100 % |
External wall plastering | 100 % |
Internal painting work | 50 % |
Electrical wire pulling | 95 % |
Overhead Tank work | 100% |
HT Work | 70% |
Door Fixing | 90% |
External putty | 90% |
Tile laying | 90% |
Fabrication work (staircase) | 100% |
Fabrication work (Grill) | 80% |
Aluminium Work | 75% |
Lift Work | 80% |
Ceiling plastering | 98 % |
Electrical wall chasing and box fixing | 99 % |
Inside wall plastering | 98 % |
Internal plumbing work | 90 % |
Inside Water proofing work | 95 % |
External wall plastering | 98 % |
Internal painting work | 45 % |
Electrical wire pulling | 70 % |
Overhead Tank work | 100% |
HT Work | 25% |
Door Fixing | 90% |
External putty | 85% |
Tile laying | 20% |
Fabrication work | 50% |
UG sump | 80% |
Ceiling plastering | 98 % |
Electrical wall chasing and box fixing | 99 % |
Inside wall plastering | 98 % |
Internal plumbing work | 85 % |
Water proofing work | 85 % |
External wall plastering | 98 % |
Internal primer work | 35 % |
Electrical wire pulling | 35 % |
Overhead Tank work | 95% |
HT Work | 20% |
Door Fixing | 80% |
External putty | 70% |
Toilet tile laying | 20% |
Fabrication work | 35% |
Ceiling plastering | 98 % |
Electrical wall chasing and box fixing | 99 % |
Inside wall plastering | 98 % |
Internal plumbing work | 45 % |
Water proofing work | 50 % |
External wall plastering | 98 % |
Internal painting | 12 % |
Electrical wire pulling | 10 % |
Overhead Tank work | 80% |
HT Work | 10% |
Door Fixing | 15% |
Ceiling plastering | 98 % |
Electrical wall chasing and box fixing | 99 % |
Inside wall plastering | 98 % |
Internal plumbing work | 28 % |
Water proofing work | 25 % |
External wall plastering | 88 % |
Internal painting | 8 % |
Electrical wire pulling | 8 % |
Overhead Tank work | 60% |
Ceiling plastering | 94 % |
Electrical wall chasing and box fixing | 95 % |
Inside wall plastering | 93 % |
Internal plumbing work | 25 % |
Water proofing work | 20 % (up to 3rd floor) |
External wall plastering | 40 % |
Internal painting | 8 % |
Electrical wire pulling | 8 % |
Overhead Tank work | 25% |
Structural work | Completed |
Block work | Completed |
Ceiling plastering | 84% |
Electrical wall chasing and box fixing | 82 % |
Inside plastering | 82 % (up to 3rd floor) |
Internal plumbing | 20 % |
Water proofing work | 13 % |
External plastering | 22 % |
Internal painting | 7% |
Electrical wire pulling | 8% |
Structural work | Completed. |
Ceiling plastering | 82 % |
Block work | Completed |
Electrical wall chasing and box fixing | 80 % |
Inside plastering | 80 % (up to 3rd floor) |
Internal plumbing | 19 % |
Water proofing work | 12 % |
External plastering | 20 % |
Structural work | Completed. |
Ceiling plastering | 77 % of Total |
Block work | Completed |
Electrical wall chasing and box fixing | 75 % (Completed up to 3rd floor) |
Inside plastering | 71 % (On progress in 3rd floor) |
Internal plumbing | 19 % |
Water proofing work | 12 % |
External plastering | 19 % |
Internal painting | 5 % |
Electrical wire pulling | 6 % |
Structural work | Terrace floor slab completed and roof top structural works started. |
Ceiling plastering | 75 % of Total |
Block work | 95 % (On progress in 4th floor) |
Electrical wall chasing and box fixing | 75 % (Completed up to 3rd floor) |
Inside plastering | 61 % (On progress in 3rd floor) |
Internal plumbing | 11 % |
Water proofing work | 12 % |
Internal painting | 5 % |
Electrical wire pulling | 6 % |
Structural work | Terrace floor slab completed and roof top structural works started. |
Ceiling plastering | 75 % of Total (Completed up to 3rd floor) |
Block work | 75 % (On progress in 3rd and 4th floor) |
Electrical wall chasing and box fixing | 45 % (On progress in 2nd floor) |
Inside plastering | 27 % (On progress in 1st floor) |
Internal plumbing | 11 % (On progress in ground and 1st floor) |
Water proofing work | 12 % (On progress in ground and 1st floor) |
Internal painting | 5 % (On progress in ground floor) |
Structural work | Roof slab half concreted and balance work in progress. |
Ceiling plastering | 55 % of Total (Completed up to 2nd floor) |
Block work | 45 % (On progress in 2nd floor) |
Electrical wall chasing and box fixing | 28% (On progress in 1st floor) |
Inside plastering | 17% (On progress in 1st floor) |
Structural work - 4th floor column concrete | 60% and works for roof slab is on progress. |
Ceiling plastering | 50 % of Total (On progress in 2nd floor) |
Block work | 33 % (Started and on progress in 2nd floor) |
Electrical wall chasing and box fixing | 28% (On progress in 1st floor) |
Inside plastering | 11% (Completed in Ground floor) |